|
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
Completed and Ongoing Projects |
 |
 |
-
Study of
sustainable sediment management practices in Alpine retention reservoirs -
Project Interreg III B Alpine Space Program, funded by the EU
-
Development
of a habitat module for integrated water resources management, Specific
Targeted Research Project (STREP), funded by the EU
HPP Franzmuehle, Weiße Elster
Ecologically
based minimum flow regulations
Marstetten Hydropower Plant, Aitrach
Ecologically
based minimum flow requirements; study of working capacity and
optimization potential
-
Development
of a decision support system for the assessment of changes in flowing waters
due to anthropogenic modifications
Haslach Diversion, Kinzig
Ecologically
based minimum flow regulations
Hydropower Plant Aach II and Aach III, Radolfzeller Aach
Integrated
minimum flow management
-
Discharge
and dynamics in longer river stretches
-
Revitalization
and economic optimization
Hydropower Plant Fa. Spathelf, Gutach
Ecologically
based minimum flow regulations
Hydropower Plant "Banteln Mill", Leine
Determination
of head and the investigation of different design alternatives and
potential energy production
-
Flood
protection measures taking into account river ecology
Hydropower Plant Rappenberghalde, Neckar
Ecologically
based minimum flow regulations
T64 Werner'sche Mill, Echaz
Ecologically
based minimum flow regulations
Regional Minimum Flow Study, Obere Eschach
Integrated
minimum flow management
-
Reactivation and
operation of an environmentally sound hydropower plant
-
Comparison
of upgrading alternatives
-
Environmentally sound hydraulic engineering
-
Effects on the river ecology of a power plant on a diverted reach
|
 |
 |
|